QUT College Stage 2
After the success of PDT's collaboration with QUT College and the refurbishment of their Kelvin Grove P Block facilities in 2020, QUT engaged PDT to continue with additional stage 2 works.
The new spaces support the learning and teaching of the College’s wide range of diploma programs including Entrepreneurship, Esports, Health, Business and STEM disciplines. The space includes a health / science lab complete with acoustically engineered periodical table on the wall; a STEM lab; a large multi-disciplinary, multi-purpose teaching space with three separate areas designed for different types of teaching and learning; and a new student breakout / lunch space adjacent to the other recently refurbished student study / relaxation space from Stage 1 works.